Flagship Development
A generational infrastructure asset in Huntsville, Alabama.
Engineered as an integrated platform — combining dispatchable waste-to-energy generation with phased carbon capture, future hydrogen production, and advanced materials recovery.

Rendering — subject to final engineering
Huntsville, Alabama
Engineered for decades of reliable operation.
The Huntsville flagship is designed to integrate advanced technology at institutional scale — with performance, community, and long-term stewardship built into the program from day one.
Project Highlights
- Approximately 4,000 tons/day processing capacity
- Advanced emissions controls
- Phased carbon capture implementation
- Future hydrogen production integration
- Materials and resource recovery
- Local economic development
- Long-term infrastructure development
Development Phasing
A disciplined, multi-phase development program.
Phase I
Waste-to-Energy & Materials Recovery
Dispatchable generation with advanced emissions controls and integrated resource recovery.
Phase II
Carbon Capture Integration
Sequenced deployment of carbon capture and storage capacity.
Phase III
Hydrogen Production
Low-carbon hydrogen production and expanded industrial integration.
